Malaya
San Miguel Corp. is on track to more than double its daily dredging of silt and trash for its P1-billion Tullahan-Tinajeros river system cleanup project from 600 metric tons (MT) per day to 1,500 MT per day for the 11.5-kilometer (km) stretch it is working on.
This covers the initial sections 1-3 of the project from the mouth of the Manila Bay in Navotas City to Tinajeros Bridge, and sections 4-5 from Tinajeros Bridge to Potrero in Malabon and Valenzuela cities. SMC’s five-year project covers the entire 27-km length of the Tullahan-Tinajeros river system.